May 10, 2021
Ikea parkade 2015 & 2021
BY Applied CoatingsApplied Coatings was the selected contractor to remove and replace 150,000 sq/ft of traffic deck membrane, the work also involved repair of 85,000 lineal feet of failed crack plus the installation of an additional 250,000 of traffic deck membrane combined with an epoxy moisture barrier.